
Martin Creates Legendary Look for Fifth East Asian Games
12 February 2010
On December 5, 2009, the Opening Ceremony of the fifth East Asian Games was held at - and in - Hong Kong’s world-renowned Victoria Harbor. The ceremony was unique in many respects and diverged from traditional opening ceremonies held at other international sporting games.
Lu Jiankang, General Manager of Beijing Olympic Large-scale Cultural and Sports Activities Ltd., was responsible for the production, an innovative concept that used Victoria Harbor as a grand stage and the skyline of Hong Kong as a spectacular background.
Jiankang used nearly 300 Martin Professional automated luminaires to create stunning maritime lighting scenes. The lighting package included 206 MAC 2000 Wash XBs™, 48 MAC 2000 Profiles™, 40 MAC 2000 Washes™, the largest number of automated lights ever used in an outdoor performance in Hong Kong. Most of the Martin lights were located on boats or barges out in the Harbor with some positioned on shore.
The “river stage” featured cruise ship parades and cultural performances coupled with lighting effects and fireworks displays. Jiankang, who worked on the Opening Ceremony of the 2008 Beijing Olympic Games, commented that the East Asian Games broke the traditional practice of opening ceremonies in that it was located outdoors and not in a stadium. It also set several opening ceremony records including those for biggest background, largest stage, and largest audience.
Martin intelligent lights as well as lasers lit up Victoria Harbor as delegations from China, Korea, Japan, Macau, Mongolia, Taipei, Guam, Hong Kong and other countries and regions entered the harbor on nine colorful boats. Four interpretative performances followed (Hong Kong Fishing Boat Lights, Vibrate City, Blessing Hong Kong and The Convergence of Kowloon), which depicted the development of Hong Kong from a small fishing village to an international metropolis. Singers Alan Tam, Andy Lau, Joey Yung and Hacken Lee debuted on a shining stage followed by a special drum and dance performance and cruise ship parade. After the official opening of the Games, a spectacular fireworks display commenced over Victoria Harbor.
Martin equipment:
206 x MAC 2000 Wash XB
40 x MAC 2000 Wash
48 x MAC 2000 Profile
Related Articles
- Peter Johansen Acquires SGM
- FBT Opens New UK Office
- Panasonic Committed to Sanyo Customers
- AC-ET's Green Hippo and PixelRange UK Open Days
- Atomic joins Adamson's Project Energia
- Powersoft Joins Crestron Integrated Partner Program
- MDG Appointed Exclusive Canadian Distributor of Robe
- Optocore Appoints Soundware as Danish Distributor
- DV2 Appointed as Exclusive Tannoy Distributor in France
- Vari-Lite Fortifies European Sales Network


